The Prague Post - US Accelerates Review for 30-Year Trans-Alaska Pipeline Renewal

EUR -
AED 4.118085
AFN 72.327475
ALL 90.580734
AMD 404.578149
ANG 2.00694
AOA 1028.259752
ARS 1712.747989
AUD 1.598703
AWG 2.021198
AZN 1.903137
BAM 1.954737
BBD 2.257372
BDT 138.614608
BGN 1.959896
BHD 0.422928
BIF 3361.771555
BMD 1.12133
BND 1.431721
BOB 13.174834
BRL 5.665411
BSD 1.12079
BTN 106.199765
BWP 15.396626
BYN 3.314197
BYR 21978.070272
BZD 2.254074
CAD 1.570614
CDF 2597.000736
CHF 0.920786
CLF 0.028087
CLP 1105.418227
CNY 7.488298
CNH 7.481834
COP 3575.349861
CRC 511.47164
CUC 1.12133
CUP 26.89837
CVE 110.197694
CZK 24.281841
DJF 199.581449
DKK 7.474596
DOP 68.775847
DZD 151.142973
EGP 62.00673
ERN 16.819952
ETB 183.578653
FJD 2.508639
FKP 0.838026
GBP 0.837129
GEL 2.903798
GGP 0.838026
GHS 12.989935
GIP 0.838026
GMD 82.978397
GNF 9919.604792
GTQ 8.565303
GYD 234.442488
HKD 8.793319
HNL 30.086636
HRK 7.534896
HTG 146.849475
HUF 366.175937
IDR 20248.250369
ILS 3.491152
IMP 0.838026
INR 106.312468
IQD 1699.075884
IRR 2054697.270937
ISK 136.19673
JEP 0.838026
JMD 177.933223
JOD 0.79498
JPY 175.966951
KES 145.61615
KGS 98.059312
KHR 4559.377873
KMF 492.842984
KPW 1009.197061
KRW 1485.594095
KWD 0.348038
KYD 0.933992
KZT 502.066929
LAK 25227.279049
LBP 100365.711751
LKR 372.037651
LRD 191.095212
LSL 18.485046
LTL 3.310997
LVL 0.678282
LYD 7.180095
MAD 11.000817
MDL 20.129052
MGA 5082.235805
MKD 61.586768
MMK 2355.184548
MNT 4036.851961
MOP 9.051777
MRU 44.786641
MUR 52.713464
MVR 17.335666
MWK 1943.442974
MXN 20.998112
MYR 4.579406
MZN 71.602163
NAD 18.485046
NGN 1492.434425
NIO 41.247566
NOK 10.457865
NPR 169.903923
NZD 1.969269
OMR 0.431087
PAB 1.12079
PEN 3.850406
PGK 5.01927
PHP 71.105777
PKR 310.203282
PLN 4.377565
PYG 6426.504666
QAR 4.096754
RON 5.3474
RSD 117.507568
RUB 91.832024
RWF 1656.499041
SAR 4.209702
SBD 9.054269
SCR 15.747974
SDG 674.478168
SEK 11.115
SGD 1.432353
SHP 0.83797
SLE 25.734597
SLL 23513.736798
SOS 640.551608
SRD 42.217519
STD 23209.269443
STN 24.486682
SVC 9.806666
SYP 14579.533814
SZL 18.482947
THB 37.822525
TJS 10.305503
TMT 3.935869
TND 3.340268
TOP 2.699893
TRY 55.772268
TTD 7.605863
TWD 36.560186
TZS 2965.91809
UAH 50.505031
UGX 4802.388013
USD 1.12133
UYU 44.935159
UZS 13345.741339
VES 986.533792
VND 28976.852191
VUV 133.357612
WST 3.100149
XAF 655.957
XAG 0.020789
XAU 0.000279317907
XCD 3.03045
XCG 2.019901
XDR 0.792839
XOF 655.957
XPF 119.331742
YER 264.744902
ZAR 18.51282
ZMK 10093.325175
ZMW 22.499763
ZWL 361.06784
SSP 6442.957706
MXV 2.370051
  • RBGPF

    -1.1000

    70.15

    -1.57%

  • BCE

    0.8300

    20.81

    +3.99%

  • CMSD

    -0.0250

    19.6

    -0.13%

  • BCC

    2.7000

    78.29

    +3.45%

  • NGG

    1.8600

    82.64

    +2.25%

  • CMSC

    -0.0700

    19.6

    -0.36%

  • RYCEF

    -0.3500

    17

    -2.06%

  • RELX

    1.4900

    40.62

    +3.67%

  • RIO

    -2.7800

    84.14

    -3.3%

  • VOD

    0.2700

    16.12

    +1.67%

  • JRI

    0.0600

    10.68

    +0.56%

  • GSK

    1.1900

    51.21

    +2.32%

  • AZN

    4.1200

    172.57

    +2.39%

  • BTI

    1.5700

    60.47

    +2.6%

  • BP

    0.2000

    50.05

    +0.4%

US Accelerates Review for 30-Year Trans-Alaska Pipeline Renewal
US Accelerates Review for 30-Year Trans-Alaska Pipeline Renewal

US Accelerates Review for 30-Year Trans-Alaska Pipeline Renewal

The Bureau of Land Management shortened public consultation to 15 days for a proposed 30-year renewal of the Trans-Alaska Pipeline System right-of-way.

Text size:

The Trump administration is accelerating an environmental review that could authorize the 800-mile Trans-Alaska Pipeline System for another 30 years. The proposal covers the pipeline, pump stations, access roads, bridges and a fuel-gas line within the federal right-of-way.

The Bureau of Land Management reduced the public-comment period to 15 days. Federal consultations commonly last 30 to 60 days or longer depending on complexity. The right-of-way was not due for renewal until 2034, which would have been its third renewal since 1974.

BLM Alaska director Kevin Pendergast said the agency was acting early to secure the pipeline while the administration seeks to expand energy development in the National Petroleum Reserve in Alaska and the Arctic National Wildlife Refuge coastal plain. The agency’s Alaska office did not separately answer a request for comment.

The system has carried oil from the North Slope to the Valdez Marine Terminal since 1977. The source report stated that it had transported more than 19 million barrels over that period, while BLM said average daily throughput in 2025 was 463,000 barrels.

Public Employees for Environmental Responsibility said the early process appeared designed to avoid fuller consideration of economic and ecological concerns. Two owners, ConocoPhillips and ExxonMobil, each gave $1 million to Trump’s inaugural fund, federal records show. Harvest Alaska is also an owner.

The review follows Trump’s Jan. 20, 2025, executive order titled “Unleashing Alaska’s Extraordinary Resource Potential,” which directed agencies to increase fossil-fuel development on federal and state land and speed project permits. Congress approved construction of the pipeline on Nov. 16, 1973, shortly after the Arab oil embargo was announced.

Comments were due through the BLM planning website or by email by Sept. 10 at 10 p.m. Alaska time, 11 p.m. Pacific time, or Sept. 11 at 2 a.m. Eastern time.

Environmental and social concerns accompanied the project from its opening, including effects on caribou habitat, permafrost and tribal practices. In 1977, White House science adviser Frank Press warned President Jimmy Carter that rising carbon-dioxide levels could alter the climate. Press projected concentrations would reach 1.5 times the preindustrial level by 2037, but the 420-parts-per-million threshold arrived 14 years earlier.

Alaska is warming two to three times faster than the global average, according to federal data. Since 1971, average annual temperatures have increased by between 2.2 degrees Fahrenheit in central Southeast Alaska and 6 degrees on the North Slope. The changes are melting permafrost and reducing sea and river ice. Glaciers are now losing ice at twice the rate recorded from 1960 through 2004.

Cooper Freeman of the Center for Biological Diversity said oil carried by the pipeline has contributed to climate disruption affecting salmon, caribou and communities. He called for a thorough and public review rather than an expedited authorization extending operations for three decades.

Y.Havel--TPP