The Prague Post - Nepal rescuers advance towards trapped tunnel workers

EUR -
AED 4.118085
AFN 72.327475
ALL 90.580734
AMD 404.578149
ANG 2.00694
AOA 1028.259752
ARS 1712.747989
AUD 1.598703
AWG 2.021198
AZN 1.903137
BAM 1.954737
BBD 2.257372
BDT 138.614608
BGN 1.959896
BHD 0.422928
BIF 3361.771555
BMD 1.12133
BND 1.431721
BOB 13.174834
BRL 5.665411
BSD 1.12079
BTN 106.199765
BWP 15.396626
BYN 3.314197
BYR 21978.070272
BZD 2.254074
CAD 1.570614
CDF 2597.000736
CHF 0.920786
CLF 0.028087
CLP 1105.418227
CNY 7.488298
CNH 7.481834
COP 3575.349861
CRC 511.47164
CUC 1.12133
CUP 26.89837
CVE 110.197694
CZK 24.281841
DJF 199.581449
DKK 7.474596
DOP 68.775847
DZD 151.142973
EGP 62.00673
ERN 16.819952
ETB 183.578653
FJD 2.508639
FKP 0.838026
GBP 0.837129
GEL 2.903798
GGP 0.838026
GHS 12.989935
GIP 0.838026
GMD 82.978397
GNF 9919.604792
GTQ 8.565303
GYD 234.442488
HKD 8.793319
HNL 30.086636
HRK 7.534896
HTG 146.849475
HUF 366.175937
IDR 20248.250369
ILS 3.491152
IMP 0.838026
INR 106.312468
IQD 1699.075884
IRR 2054697.270937
ISK 136.19673
JEP 0.838026
JMD 177.933223
JOD 0.79498
JPY 175.966951
KES 145.61615
KGS 98.059312
KHR 4559.377873
KMF 492.842984
KPW 1009.197061
KRW 1485.594095
KWD 0.348038
KYD 0.933992
KZT 502.066929
LAK 25227.279049
LBP 100365.711751
LKR 372.037651
LRD 191.095212
LSL 18.485046
LTL 3.310997
LVL 0.678282
LYD 7.180095
MAD 11.000817
MDL 20.129052
MGA 5082.235805
MKD 61.586768
MMK 2355.184548
MNT 4036.851961
MOP 9.051777
MRU 44.786641
MUR 52.713464
MVR 17.335666
MWK 1943.442974
MXN 20.998112
MYR 4.579406
MZN 71.602163
NAD 18.485046
NGN 1492.434425
NIO 41.247566
NOK 10.457865
NPR 169.903923
NZD 1.969269
OMR 0.431087
PAB 1.12079
PEN 3.850406
PGK 5.01927
PHP 71.105777
PKR 310.203282
PLN 4.377565
PYG 6426.504666
QAR 4.096754
RON 5.3474
RSD 117.507568
RUB 91.832024
RWF 1656.499041
SAR 4.209702
SBD 9.054269
SCR 15.747974
SDG 674.478168
SEK 11.115
SGD 1.432353
SHP 0.83797
SLE 25.734597
SLL 23513.736798
SOS 640.551608
SRD 42.217519
STD 23209.269443
STN 24.486682
SVC 9.806666
SYP 14579.533814
SZL 18.482947
THB 37.822525
TJS 10.305503
TMT 3.935869
TND 3.340268
TOP 2.699893
TRY 55.772268
TTD 7.605863
TWD 36.560186
TZS 2965.91809
UAH 50.505031
UGX 4802.388013
USD 1.12133
UYU 44.935159
UZS 13345.741339
VES 986.533792
VND 28976.852191
VUV 133.357612
WST 3.100149
XAF 655.957
XAG 0.020789
XAU 0.000279317907
XCD 3.03045
XCG 2.019901
XDR 0.792839
XOF 655.957
XPF 119.331742
YER 264.744902
ZAR 18.51282
ZMK 10093.325175
ZMW 22.499763
ZWL 361.06784
SSP 6442.957706
MXV 2.370051
  • RBGPF

    -1.1000

    70.15

    -1.57%

  • JRI

    0.0600

    10.68

    +0.56%

  • CMSC

    -0.0700

    19.6

    -0.36%

  • CMSD

    -0.0250

    19.6

    -0.13%

  • NGG

    1.8600

    82.64

    +2.25%

  • RIO

    -2.7800

    84.14

    -3.3%

  • BCC

    2.7000

    78.29

    +3.45%

  • AZN

    4.1200

    172.57

    +2.39%

  • GSK

    1.1900

    51.21

    +2.32%

  • BCE

    0.8300

    20.81

    +3.99%

  • RELX

    1.4900

    40.62

    +3.67%

  • RYCEF

    -0.3500

    17

    -2.06%

  • VOD

    0.2700

    16.12

    +1.67%

  • BP

    0.2000

    50.05

    +0.4%

  • BTI

    1.5700

    60.47

    +2.6%

Nepal rescuers advance towards trapped tunnel workers

Nepal rescuers advance towards trapped tunnel workers

Nepali rescuers drilled, dug and used explosives on Sunday in a bid to reach dozens of hydropower workers believed trapped in tunnels swamped by flood debris, racing against time to find survivors.

Text size:

Rescue operations entered their fifth day since the floods hit the Nepal-China border. Teams battled rain, rising rivers and treacherous conditions at the disaster sites.

Nepal's government says more than 100 workers may still be trapped alive inside multiple tunnels at hydropower projects, with key rescue efforts focused on the Trishuli 3A and 3B sites in a Himalayan valley.

"Efforts to rescue people trapped inside the tunnel of the Upper Trishuli 3A Hydropower Project in Nuwakot have been intensified, including attempts by engineers from the Nepali Army to carry out blasting operations," Nepal's energy ministry said on Sunday.

They are among 933 hydropower workers missing since a wall of mud and debris swept down on Wednesday morning, according to the National Disaster Risk Reduction and Management Authority.

The team, comprising around 90 army and police personnel, first broke through into the upper part of a mud-swamped 3A tunnel on Saturday night, pumping air inside and sending in a camera.

Using heavy equipment including "drilling machines, excavators, hydraulic cutters, and other equipment" on Sunday, they drilled four holes before rescuers descended by rope into the crater.

"After descending through the opening using ropes and calling out to those inside, no response was received," the prime minister's office said in a statement.

"To make the rescue operation easier and faster, the teams are simultaneously using heavy equipment, carrying out blasting, and widening the opening."

Photographs shared by the disaster office showed workers wading through churned mud and navigating vast boulders left by the floods.

Work continues to "clear the entrance", the energy ministry said, which it said is approximately 180 metres (590 feet) from the "working space".

"... preparations are being made to send rescuers equipped with oxygen into the tunnel," once the opening is cleared, the energy ministry said.

"A camera will also be sent in with the rescuers, allowing the actual conditions inside the tunnel to be monitored from outside," it said.

"Once the working space is reached, more clear information will be available about the actual condition, location, and safety status of the people trapped inside."

- 'Submerged with slush' -

The US Geological Survey said the disaster was caused by a glacial collapse.

Specialised Indian, Chinese and South Korean tunnel-rescue teams have also joined the efforts.

Nepal's expert mountain rescue teams -- who regularly aid climbers on the world's highest peaks, including Everest -- are also joining the search for missing people at another damaged hydropower site.

Flood survivors from other hydropower sites described a terrifying rush of water that had engulfed them within minutes.

Hydropower worker Surendra Dowluri, 33, from India's Andhra Pradesh state, described how raging water swamped the Upper Trishuli-1 site, where he was working.

"We heard a very loud sound... and saw that the turbine floor was submerged with slush, and six workers were stuck in that," Dowluri told AFP in Kathmandu on Sunday after being rescued the day before.

"We managed to rescue five of them, but one person lost his life," he said, describing how some workers reached higher ground or construction areas out of reach of the torrent.

That represents about 10 percent of Nepal's installed electricity generation capacity, according to the authority.

Another 15 power projects under construction, with a combined planned capacity of 470 megawatts, have also been damaged.

I.Mala--TPP