The Prague Post - NASA begins critical final test on mega Moon rocket

EUR -
AED 4.303228
AFN 81.923031
ALL 97.909719
AMD 450.171953
ANG 2.096976
AOA 1074.487442
ARS 1469.906879
AUD 1.794206
AWG 2.109136
AZN 1.999097
BAM 1.952812
BBD 2.36751
BDT 142.865081
BGN 1.956194
BHD 0.441689
BIF 3493.476377
BMD 1.171742
BND 1.499089
BOB 8.09162
BRL 6.38623
BSD 1.172657
BTN 100.430197
BWP 15.654757
BYN 3.837305
BYR 22966.148894
BZD 2.355312
CAD 1.60343
CDF 3381.648779
CHF 0.932675
CLF 0.028783
CLP 1104.543443
CNY 8.406137
CNH 8.419173
COP 4747.466217
CRC 592.777215
CUC 1.171742
CUP 31.051171
CVE 110.844284
CZK 24.62897
DJF 208.806749
DKK 7.460554
DOP 70.355427
DZD 151.979693
EGP 58.199616
ERN 17.576134
ETB 162.732892
FJD 2.633784
FKP 0.863301
GBP 0.861412
GEL 3.175237
GGP 0.863301
GHS 12.189053
GIP 0.863301
GMD 83.77774
GNF 10169.893454
GTQ 9.00046
GYD 245.007696
HKD 9.198218
HNL 30.661649
HRK 7.536664
HTG 153.898122
HUF 400.449921
IDR 19043.155705
ILS 3.925073
IMP 0.863301
INR 100.421007
IQD 1536.081823
IRR 49359.64357
ISK 143.011291
JEP 0.863301
JMD 187.151234
JOD 0.830746
JPY 171.786824
KES 151.507599
KGS 102.468664
KHR 4708.024801
KMF 492.716372
KPW 1054.5423
KRW 1612.756825
KWD 0.357885
KYD 0.977198
KZT 609.283796
LAK 25260.767597
LBP 105061.138103
LKR 352.496985
LRD 235.101302
LSL 20.85478
LTL 3.45985
LVL 0.708775
LYD 6.333688
MAD 10.551579
MDL 19.845889
MGA 5178.92726
MKD 61.542715
MMK 2460.081593
MNT 4204.866527
MOP 9.481136
MRU 46.568354
MUR 53.067974
MVR 18.04166
MWK 2033.178856
MXN 21.792886
MYR 4.981087
MZN 74.944607
NAD 20.85478
NGN 1795.296721
NIO 43.151062
NOK 11.826043
NPR 160.688716
NZD 1.952949
OMR 0.450535
PAB 1.171018
PEN 4.153238
PGK 4.916982
PHP 66.250171
PKR 333.35795
PLN 4.239311
PYG 9345.064305
QAR 4.265851
RON 5.076338
RSD 117.128528
RUB 91.628726
RWF 1694.34904
SAR 4.394767
SBD 9.768727
SCR 17.19417
SDG 703.628272
SEK 11.143369
SGD 1.500779
SHP 0.920805
SLE 26.369196
SLL 24570.854255
SOS 670.161186
SRD 43.733523
STD 24252.699675
SVC 10.259875
SYP 15235.145419
SZL 20.846682
THB 38.323037
TJS 11.262367
TMT 4.112815
TND 3.415494
TOP 2.744335
TRY 46.925742
TTD 7.955352
TWD 34.175011
TZS 3069.964632
UAH 48.977755
UGX 4209.559576
USD 1.171742
UYU 47.019267
UZS 14863.921153
VES 131.572362
VND 30626.414118
VUV 139.793453
WST 3.226231
XAF 655.821156
XAG 0.03215
XAU 0.000356
XCD 3.166692
XDR 0.815631
XOF 655.821156
XPF 119.331742
YER 283.385812
ZAR 20.926173
ZMK 10547.081684
ZMW 28.405116
ZWL 377.300539
  • CMSC

    0.0900

    22.314

    +0.4%

  • CMSD

    0.0250

    22.285

    +0.11%

  • RBGPF

    0.0000

    69.04

    0%

  • SCS

    0.0400

    10.74

    +0.37%

  • RELX

    0.0300

    53

    +0.06%

  • RIO

    -0.1400

    59.33

    -0.24%

  • GSK

    0.1300

    41.45

    +0.31%

  • NGG

    0.2700

    71.48

    +0.38%

  • BP

    0.1750

    30.4

    +0.58%

  • BTI

    0.7150

    48.215

    +1.48%

  • BCC

    0.7900

    91.02

    +0.87%

  • JRI

    0.0200

    13.13

    +0.15%

  • VOD

    0.0100

    9.85

    +0.1%

  • BCE

    -0.0600

    22.445

    -0.27%

  • RYCEF

    0.1000

    12

    +0.83%

  • AZN

    -0.1200

    73.71

    -0.16%

NASA begins critical final test on mega Moon rocket
NASA begins critical final test on mega Moon rocket

NASA begins critical final test on mega Moon rocket

NASA on Friday begins a critical two-day-long test of its giant Space Launch System (SLS) rocket complete with a mock countdown, as the agency gears up to return humans to the Moon.

Text size:

Known as the "wet dress rehearsal," it is the final major test before the Artemis-1 mission this summer: an uncrewed lunar flight that will eventually be followed by boots on the ground, likely no sooner than 2026.

"It is our last design verification prior to our launch," senior NASA official Tom Whitmeyer said in a call with reporters this week.

Data collected from the test will be used to finalize a date for Artemis-1 -- NASA had said May could be the first window, but later now seems likely.

It is called a "wet" dress rehearsal because super-cooled liquid hydrogen and liquid oxygen will be loaded into SLS from ground systems, just as they would be in a real launch.

The 322 feet (98 meters) tall rocket -- expected to be the most powerful in history at the time it is operational -- was rolled out to Launch Complex 39B at the Kennedy Space Center in Florida around two weeks ago.

The test begins at 5:00 pm Eastern Time (2100 GMT) with a "call to stations," as members of the launch control team arrive at their firing rooms and start a countdown of more than 45 hours.

With the SLS rocket and Orion crew capsule fixed on top powered on, teams will proceed to load 700,000 gallons (3.2 million liters) of propellant, and practice procedures such as pauses in countdown and other checks.

They won't actually ignite the rocket's RS-25 engines, which were tested previously. Instead they will halt the countdown about 10 seconds before liftoff, in order to simulate a "scrub," when launch is aborted due to technical or weather related issues.

The fuel will be drained, and a few days later SLS and Orion will be rolled back to the vehicle assembly building to carry out checks on how everything went.

Test milestones will be posted on NASA's blog for the Artemis mission, but the agency won't let the public listen to live internal audio, as it did in the past for Space Shuttle missions.

Whitmeyer explained this was because certain key information, including timing sequences, could assist other countries looking to develop long range missiles.

"We're really, really super sensitive to cryogenic launch vehicles that are of this size and capability, (and) are very analogous to ballistic type capabilities that our countries are very interested in," he said, but added that the agency could re-evaluate the position in future.

C.Novotny--TPP