The Prague Post - NASA chief rules out March launch of Moon mission over technical issues

EUR -
AED 4.19149
AFN 75.326652
ALL 93.564593
AMD 416.195856
AOA 1047.730486
ARS 1692.173247
AUD 1.62962
AWG 2.0558
AZN 1.928658
BAM 1.952965
BBD 2.293521
BDT 140.545986
BHD 0.429471
BIF 3400.748626
BMD 1.141318
BND 1.470559
BOB 12.383025
BRL 5.772559
BSD 1.138767
BTN 110.024326
BWP 15.517543
BYN 3.282407
BYR 22369.838276
BZD 2.290226
CAD 1.606434
CDF 2579.379536
CHF 0.929427
CLF 0.027127
CLP 1067.646294
CNY 7.73017
CNH 7.726885
COP 3672.46548
CRC 516.643258
CUC 1.141318
CUP 30.244934
CVE 110.105173
CZK 24.194978
DJF 202.779202
DKK 7.475441
DOP 66.282914
DZD 152.064677
EGP 58.543236
ERN 17.119774
ETB 183.791396
FJD 2.561349
FKP 0.853265
GBP 0.853575
GEL 3.00173
GGP 0.853265
GHS 13.225802
GIP 0.853265
GMD 83.878592
GNF 9991.36537
GTQ 8.686391
GYD 238.234183
HKD 8.948911
HNL 30.494334
HRK 7.536007
HTG 148.885836
HUF 363.963343
IDR 20496.820848
ILS 3.502563
IMP 0.853265
INR 110.170369
IQD 1491.767249
IRR 1569597.964032
ISK 143.394821
JEP 0.853265
JMD 180.725287
JOD 0.809169
JPY 186.402334
KES 147.811907
KGS 99.808429
KHR 4600.382615
KMF 493.0496
KRW 1678.196071
KWD 0.353489
KYD 0.948943
KZT 532.388854
LAK 25758.383824
LBP 101970.58757
LKR 382.97073
LRD 206.109009
LSL 18.766395
LTL 3.370016
LVL 0.690372
LYD 7.307521
MAD 10.690482
MDL 20.023758
MGA 4858.92557
MKD 61.485748
MMK 2395.892235
MNT 4098.665327
MOP 9.196352
MRU 45.490369
MUR 53.858883
MVR 17.644733
MWK 1974.525159
MXN 19.902183
MYR 4.666815
MZN 72.942069
NAD 18.766969
NGN 1565.295241
NIO 41.908615
NOK 10.940295
NPR 176.038152
NZD 1.968289
OMR 0.438824
PAB 1.138747
PEN 3.873877
PGK 5.094538
PHP 70.472929
PKR 316.363358
PLN 4.329077
PYG 6902.071767
QAR 4.151374
RON 5.235799
RSD 117.423363
RUB 89.507123
RWF 1675.545782
SAR 4.281905
SBD 9.219434
SCR 16.054533
SDG 685.356221
SEK 11.070371
SGD 1.472646
SLE 27.676548
SOS 650.746833
SRD 43.068215
STD 23622.984071
STN 24.464167
SVC 9.963755
SZL 18.748867
THB 38.570282
TJS 10.533341
TMT 4.006027
TND 3.370907
TRY 53.909942
TTD 7.726953
TWD 36.845182
TZS 3013.07795
UAH 50.992157
UGX 4258.817963
USD 1.141318
UYU 45.693672
UZS 13723.079782
VES 841.105063
VND 30029.795908
VUV 135.844352
WST 3.130372
XAF 654.997607
XAG 0.01937
XAU 0.000279
XCD 3.08447
XCG 2.052266
XDR 0.814621
XOF 655.017664
XPF 119.331742
YER 272.315556
ZAR 18.741479
ZMK 10273.236182
ZMW 20.924085
ZWL 367.50402
  • RBGPF

    0.4200

    67.77

    +0.62%

  • CMSC

    -0.0850

    21.91

    -0.39%

  • BCC

    3.3000

    77.7

    +4.25%

  • VOD

    0.2400

    15.51

    +1.55%

  • RYCEF

    -0.0800

    18.17

    -0.44%

  • RELX

    0.0100

    32.74

    +0.03%

  • GSK

    -0.0200

    50.76

    -0.04%

  • RIO

    1.7300

    92.28

    +1.87%

  • BCE

    -0.1700

    21.48

    -0.79%

  • NGG

    1.8200

    83.87

    +2.17%

  • JRI

    -0.0100

    12.92

    -0.08%

  • BTI

    0.6400

    62.06

    +1.03%

  • CMSD

    -0.0500

    22.15

    -0.23%

  • AZN

    0.3900

    169.73

    +0.23%

  • BP

    0.5600

    43.32

    +1.29%

NASA chief rules out March launch of Moon mission over technical issues
NASA chief rules out March launch of Moon mission over technical issues / Photo: Miguel J. Rodriguez Carrillo - AFP/File

NASA chief rules out March launch of Moon mission over technical issues

NASA chief Jared Isaacman on Saturday ruled out a March launch for Artemis 2, the first crewed flyby mission to the Moon in more than 50 years, citing technical issues.

Text size:

Workers detected a problem with helium flow to the massive SLS rocket that will "take the March launch window out of consideration," Issacman said in a post on X.

"I understand people are disappointed by this development. That disappointment is felt most by the team at NASA, who have been working tirelessly to prepare for this great endeavor," Isaacman said.

"During the 1960s, when NASA achieved what most thought was impossible, and what has never been repeated since, there were many setbacks."

The towering SLS rocket and Orion spacecraft will be rolled back into the Vehicle Assembly Building at the Kennedy Space Center in Florida to investigate the technical issues and make any necessary repairs, Isaacman said.

A complete briefing will follow in the coming days, he added.

The highly anticipated Artemis 2 mission, lasting about 10 days, will see three Americans and one Canadian fly around Earth's satellite.

It would be a huge step towards Americans once again setting foot on the lunar surface, a goal announced by President Donald Trump in his first term.

On Friday, NASA had set March 6 as the earliest possible launch date.

The US space agency hopes to put humans back on the Moon as China forges ahead with a rival effort that is targeting 2030 at the latest for its first crewed mission.

China's uncrewed Chang'e 7 mission is expected to be launched in 2026 for an exploration of the Moon's south pole, and testing of its crewed spacecraft Mengzhou is also set to go ahead this year.

NASA surprised many late last year when it said Artemis 2 could happen as soon as February -- an acceleration explained by the Trump administration's wish to beat China to the punch.

But the program has been plagued by delays.

The uncrewed Artemis 1 mission took place in November 2022 after multiple postponements and two failed launch attempts.

Then technical problems in early February -- which included a liquid hydrogen leak -- cut short a so-called wet dress rehearsal for the Artemis 2 launch. That was finally completed earlier this week.

The wet dress rehearsal was conducted under real conditions -- with full rocket tanks and technical checks -- at Cape Canaveral in Florida, with engineers practicing the maneuvers needed to carry out an actual launch.

NASA is hoping that the Moon could be used to help prepare future missions to Mars.

J.Simacek--TPP