The Prague Post - All systems go for Artemis 1 mission to Moon

EUR -
AED 4.315589
AFN 76.974567
ALL 96.64069
AMD 445.460156
ANG 2.103537
AOA 1077.574033
ARS 1679.530185
AUD 1.718107
AWG 2.116957
AZN 1.999539
BAM 1.963533
BBD 2.366219
BDT 143.715997
BGN 1.973441
BHD 0.443007
BIF 3478.319484
BMD 1.175108
BND 1.5079
BOB 8.135625
BRL 6.210328
BSD 1.174827
BTN 107.566765
BWP 15.615502
BYN 3.322973
BYR 23032.115505
BZD 2.362886
CAD 1.620362
CDF 2561.73537
CHF 0.927707
CLF 0.025944
CLP 1024.40059
CNY 8.194728
CNH 8.185285
COP 4245.053909
CRC 579.783364
CUC 1.175108
CUP 31.14036
CVE 110.636222
CZK 24.272031
DJF 208.840612
DKK 7.470008
DOP 74.153038
DZD 152.370329
EGP 55.296349
ERN 17.626619
ETB 182.553205
FJD 2.644349
FKP 0.875153
GBP 0.870714
GEL 3.160975
GGP 0.875153
GHS 12.779272
GIP 0.875153
GMD 85.782729
GNF 10282.195179
GTQ 9.010951
GYD 245.782279
HKD 9.162534
HNL 31.093415
HRK 7.533379
HTG 153.902185
HUF 381.968205
IDR 19773.541204
ILS 3.685755
IMP 0.875153
INR 107.591179
IQD 1539.391393
IRR 49501.421901
ISK 146.006687
JEP 0.875153
JMD 184.988541
JOD 0.83318
JPY 186.290052
KES 151.588842
KGS 102.763393
KHR 4736.859926
KMF 493.545425
KPW 1057.504675
KRW 1723.624766
KWD 0.360853
KYD 0.979064
KZT 594.488749
LAK 25370.580253
LBP 100530.483192
LKR 363.941765
LRD 217.923529
LSL 19.042599
LTL 3.469788
LVL 0.710811
LYD 7.497946
MAD 10.781565
MDL 20.053698
MGA 5305.612134
MKD 61.596848
MMK 2467.698154
MNT 4191.54779
MOP 9.435658
MRU 46.845645
MUR 54.237671
MVR 18.155627
MWK 2037.637108
MXN 20.530788
MYR 4.735851
MZN 75.101139
NAD 19.042641
NGN 1668.806169
NIO 43.120366
NOK 11.577739
NPR 172.117117
NZD 1.987219
OMR 0.451818
PAB 1.174767
PEN 3.943076
PGK 4.928988
PHP 69.337263
PKR 328.901693
PLN 4.199712
PYG 7917.180274
QAR 4.278862
RON 5.092444
RSD 117.396805
RUB 89.310923
RWF 1707.431828
SAR 4.406586
SBD 9.54612
SCR 17.707763
SDG 706.824292
SEK 10.584313
SGD 1.505197
SHP 0.881635
SLE 28.676476
SLL 24641.424959
SOS 665.110709
SRD 44.907895
STD 24322.361699
STN 25.000421
SVC 10.27944
SYP 12996.194205
SZL 18.97211
THB 36.534216
TJS 10.960761
TMT 4.112878
TND 3.375791
TOP 2.829378
TRY 50.935173
TTD 7.97541
TWD 37.123187
TZS 2990.649431
UAH 50.766317
UGX 4105.925804
USD 1.175108
UYU 44.916705
UZS 14259.934481
VES 413.949884
VND 30869.49787
VUV 141.60825
WST 3.251349
XAF 658.54776
XAG 0.012136
XAU 0.000237
XCD 3.175788
XCG 2.11733
XDR 0.820168
XOF 657.479349
XPF 119.331742
YER 280.033559
ZAR 18.946013
ZMK 10577.385086
ZMW 23.466219
ZWL 378.384275
  • RBGPF

    0.0000

    84.04

    0%

  • SCS

    0.0200

    16.14

    +0.12%

  • BCC

    0.5000

    85.51

    +0.58%

  • CMSC

    0.0400

    23.65

    +0.17%

  • CMSD

    0.0400

    24.04

    +0.17%

  • RELX

    -0.4800

    39.84

    -1.2%

  • RYCEF

    0.0700

    16.97

    +0.41%

  • JRI

    -0.0500

    13.67

    -0.37%

  • GSK

    0.5800

    48.65

    +1.19%

  • NGG

    -0.6700

    80.18

    -0.84%

  • RIO

    -1.5400

    87.3

    -1.76%

  • BCE

    0.2000

    24.71

    +0.81%

  • AZN

    1.1500

    91.69

    +1.25%

  • VOD

    0.3400

    13.94

    +2.44%

  • BTI

    0.5100

    58.22

    +0.88%

  • BP

    -0.4900

    35.43

    -1.38%

All systems go for Artemis 1 mission to Moon
All systems go for Artemis 1 mission to Moon / Photo: Gregg Newton - AFP/File

All systems go for Artemis 1 mission to Moon

Fifty years after the last Apollo mission, the Artemis program is poised to take up the baton of lunar exploration with a test launch on Monday of NASA's most powerful rocket ever.

Text size:

The goal is to return humans to the Moon for the first time since the last Apollo mission in 1972 -- and eventually to Mars.

The 322-foot (98-meter) Space Launch System (SLS) rocket is scheduled to blast off at 8:33 am (1233 GMT) from the Kennedy Space Center (KSC) in Florida.

The mission, more than a decade in the planning, may be uncrewed, but is highly symbolic for NASA, which has been under pressure from China and private rivals such as SpaceX.

Hotels around Cape Canaveral are booked solid with between 100,000 and 200,000 spectators expected to attend the launch.

The massive orange-and-white rocket has been sitting on KSC's Launch Complex 39B for a week.

"Ever since we rolled out to the pad last week, you can feel the excitement, the energy," said Janet Petro, director of KSC. "It's really, really palpable."

The objective of the flight, baptized Artemis 1, is to test the SLS and the Orion crew capsule that sits atop the rocket.

Mannequins equipped with sensors will take the place of crew members, recording acceleration, vibration and radiation levels.

Cameras will capture every moment of the 42-day trip and include a selfie of the spacecraft with the Moon and Earth in the background.

- Splashdown in Pacific -

The Orion capsule will orbit around the Moon, coming within 60 miles (100 kilometers) at its closest approach and then firing its engines to get to a distance 40,000 miles beyond, a record for a spacecraft rated to carry humans.

One of the primary objectives of the mission is to test the capsule's heat shield, which at 16 feet in diameter is the largest ever built.

On its return to the Earth's atmosphere, the heat shield will have to withstand a speed of 25,000 miles per hour and a temperature of 5,000 degrees Fahrenheit (2,760 degrees Celsius).

Orion, its descent slowed by parachutes, will end its voyage with a splashdown off the coast of San Diego in the Pacific.

Monday's liftoff will be at the mercy of the weather, which can be unpredictable in Florida at this time of year, and NASA has built in a two-hour launch window.

If the rocket is unable to take off on Monday, September 2 and 5 have been penciled in as alternative flight dates.

Otherwise, it's all systems go.

NASA gave the green light for the mission on Tuesday after a detailed inspection known as a flight readiness review.

That doesn't mean things can't go wrong with a rocket and a capsule flying for the first time.

- 'Inherent risk' -

"We're doing something that is incredibly difficult to do and does carry inherent risk in it," said Mike Sarafin, the Artemis 1 mission manager.

Because it is an uncrewed flight, Sarafin said the mission will continue in conditions that would not be acceptable for a flight with astronauts.

"If we had a failed solar array deployment we would proceed, and that is something that we wouldn't necessarily do on a crewed flight," he said.

A complete failure would be devastating for a program that is costing $4.1 billion per launch and is already running years behind schedule.

The next mission, Artemis 2, will take astronauts into orbit around the Moon without landing on its surface. The crew of Artemis 3 is to land on the Moon in 2025 at the earliest.

While the Apollo astronauts who walked on the Moon were exclusively white men, the Artemis program plans to include the first woman and person of color.

And since humans have already visited the Moon, Artemis has its sights set on another lofty goal -- an eventual crewed mission to Mars.

Gateway would serve as a staging and refueling station for a voyage to Mars that would take a minimum of several months.

"I think it's going to inspire even more than Apollo did," Bob Cabana, associate NASA administrator and a former astronaut, said of Artemis. "It's going to be absolutely outstanding."

F.Prochazka--TPP