The Prague Post - All systems go for Artemis 1 mission to Moon

EUR -
AED 4.265018
AFN 73.164365
ALL 95.984408
AMD 438.161514
ANG 2.078485
AOA 1064.9476
ARS 1644.194061
AUD 1.643978
AWG 2.093314
AZN 1.976241
BAM 1.964688
BBD 2.339183
BDT 142.042616
BGN 1.913476
BHD 0.438345
BIF 3269.169352
BMD 1.161339
BND 1.487228
BOB 8.054021
BRL 6.044998
BSD 1.161414
BTN 107.135694
BWP 15.782587
BYN 3.394758
BYR 22762.244868
BZD 2.335666
CAD 1.578626
CDF 2508.492034
CHF 0.903545
CLF 0.026921
CLP 1062.997138
CNY 8.026131
CNH 8.006854
COP 4370.792324
CRC 552.882256
CUC 1.161339
CUP 30.775484
CVE 110.849219
CZK 24.360278
DJF 206.393051
DKK 7.47108
DOP 70.259233
DZD 152.768643
EGP 61.314287
ERN 17.420085
ETB 182.330711
FJD 2.561507
FKP 0.865868
GBP 0.865285
GEL 3.170779
GGP 0.865868
GHS 12.524983
GIP 0.865868
GMD 84.777707
GNF 10190.75001
GTQ 8.907994
GYD 242.981366
HKD 9.081549
HNL 30.868682
HRK 7.531981
HTG 152.153117
HUF 387.724069
IDR 19617.338792
ILS 3.602578
IMP 0.865868
INR 107.385304
IQD 1520.773452
IRR 1534012.71618
ISK 145.09754
JEP 0.865868
JMD 181.943917
JOD 0.823385
JPY 183.378336
KES 150.156059
KGS 101.559174
KHR 4662.776229
KMF 493.569554
KPW 1045.204775
KRW 1708.863903
KWD 0.357286
KYD 0.967887
KZT 578.346502
LAK 24777.168142
LBP 103997.909634
LKR 361.719573
LRD 212.525118
LSL 19.208356
LTL 3.429132
LVL 0.702482
LYD 7.415117
MAD 10.926748
MDL 20.127231
MGA 4854.397313
MKD 61.613196
MMK 2438.894557
MNT 4144.927437
MOP 9.349858
MRU 46.581564
MUR 53.595493
MVR 17.942852
MWK 2016.670191
MXN 20.551009
MYR 4.58383
MZN 74.221197
NAD 19.209044
NGN 1623.830144
NIO 42.632671
NOK 11.149122
NPR 171.417511
NZD 1.959818
OMR 0.446539
PAB 1.161455
PEN 4.05133
PGK 5.011171
PHP 68.884814
PKR 324.420344
PLN 4.249049
PYG 7473.876987
QAR 4.228427
RON 5.09677
RSD 117.425337
RUB 90.875244
RWF 1697.996542
SAR 4.359873
SBD 9.343184
SCR 15.774659
SDG 697.39312
SEK 10.622495
SGD 1.481259
SHP 0.871305
SLE 28.481821
SLL 24352.697907
SOS 663.709652
SRD 43.74416
STD 24037.37306
STN 25.026856
SVC 10.162062
SYP 128.420772
SZL 19.208617
THB 36.883826
TJS 11.131774
TMT 4.064687
TND 3.39095
TOP 2.796226
TRY 51.19705
TTD 7.880653
TWD 36.950358
TZS 2996.254949
UAH 51.041457
UGX 4372.782945
USD 1.161339
UYU 46.460593
UZS 14185.75567
VES 502.42505
VND 30517.0862
VUV 138.634464
WST 3.182637
XAF 658.938108
XAG 0.013282
XAU 0.000226
XCD 3.138577
XCG 2.09317
XDR 0.823103
XOF 657.317509
XPF 119.331742
YER 277.095098
ZAR 18.975461
ZMK 10453.442713
ZMW 22.445546
ZWL 373.950692
  • RBGPF

    0.1000

    82.5

    +0.12%

  • CMSD

    -0.0400

    23.16

    -0.17%

  • JRI

    0.0100

    12.58

    +0.08%

  • RYCEF

    -0.3000

    16.7

    -1.8%

  • GSK

    1.0000

    55.51

    +1.8%

  • CMSC

    0.0350

    23.22

    +0.15%

  • BCC

    -0.8600

    74.49

    -1.15%

  • RIO

    0.1400

    90.35

    +0.15%

  • NGG

    0.5500

    90.41

    +0.61%

  • BCE

    -0.1800

    25.88

    -0.7%

  • RELX

    0.0000

    35.68

    0%

  • VOD

    -0.0300

    14.48

    -0.21%

  • AZN

    0.7300

    194.95

    +0.37%

  • BP

    0.2100

    40.65

    +0.52%

  • BTI

    0.4600

    58.33

    +0.79%

All systems go for Artemis 1 mission to Moon
All systems go for Artemis 1 mission to Moon / Photo: Gregg Newton - AFP/File

All systems go for Artemis 1 mission to Moon

Fifty years after the last Apollo mission, the Artemis program is poised to take up the baton of lunar exploration with a test launch on Monday of NASA's most powerful rocket ever.

Text size:

The goal is to return humans to the Moon for the first time since the last Apollo mission in 1972 -- and eventually to Mars.

The 322-foot (98-meter) Space Launch System (SLS) rocket is scheduled to blast off at 8:33 am (1233 GMT) from the Kennedy Space Center (KSC) in Florida.

The mission, more than a decade in the planning, may be uncrewed, but is highly symbolic for NASA, which has been under pressure from China and private rivals such as SpaceX.

Hotels around Cape Canaveral are booked solid with between 100,000 and 200,000 spectators expected to attend the launch.

The massive orange-and-white rocket has been sitting on KSC's Launch Complex 39B for a week.

"Ever since we rolled out to the pad last week, you can feel the excitement, the energy," said Janet Petro, director of KSC. "It's really, really palpable."

The objective of the flight, baptized Artemis 1, is to test the SLS and the Orion crew capsule that sits atop the rocket.

Mannequins equipped with sensors will take the place of crew members, recording acceleration, vibration and radiation levels.

Cameras will capture every moment of the 42-day trip and include a selfie of the spacecraft with the Moon and Earth in the background.

- Splashdown in Pacific -

The Orion capsule will orbit around the Moon, coming within 60 miles (100 kilometers) at its closest approach and then firing its engines to get to a distance 40,000 miles beyond, a record for a spacecraft rated to carry humans.

One of the primary objectives of the mission is to test the capsule's heat shield, which at 16 feet in diameter is the largest ever built.

On its return to the Earth's atmosphere, the heat shield will have to withstand a speed of 25,000 miles per hour and a temperature of 5,000 degrees Fahrenheit (2,760 degrees Celsius).

Orion, its descent slowed by parachutes, will end its voyage with a splashdown off the coast of San Diego in the Pacific.

Monday's liftoff will be at the mercy of the weather, which can be unpredictable in Florida at this time of year, and NASA has built in a two-hour launch window.

If the rocket is unable to take off on Monday, September 2 and 5 have been penciled in as alternative flight dates.

Otherwise, it's all systems go.

NASA gave the green light for the mission on Tuesday after a detailed inspection known as a flight readiness review.

That doesn't mean things can't go wrong with a rocket and a capsule flying for the first time.

- 'Inherent risk' -

"We're doing something that is incredibly difficult to do and does carry inherent risk in it," said Mike Sarafin, the Artemis 1 mission manager.

Because it is an uncrewed flight, Sarafin said the mission will continue in conditions that would not be acceptable for a flight with astronauts.

"If we had a failed solar array deployment we would proceed, and that is something that we wouldn't necessarily do on a crewed flight," he said.

A complete failure would be devastating for a program that is costing $4.1 billion per launch and is already running years behind schedule.

The next mission, Artemis 2, will take astronauts into orbit around the Moon without landing on its surface. The crew of Artemis 3 is to land on the Moon in 2025 at the earliest.

While the Apollo astronauts who walked on the Moon were exclusively white men, the Artemis program plans to include the first woman and person of color.

And since humans have already visited the Moon, Artemis has its sights set on another lofty goal -- an eventual crewed mission to Mars.

Gateway would serve as a staging and refueling station for a voyage to Mars that would take a minimum of several months.

"I think it's going to inspire even more than Apollo did," Bob Cabana, associate NASA administrator and a former astronaut, said of Artemis. "It's going to be absolutely outstanding."

F.Prochazka--TPP