The Prague Post - NASA's Moon mission pushed back, again

EUR -
AED 4.299841
AFN 79.91575
ALL 97.255677
AMD 447.136882
ANG 2.095514
AOA 1073.642023
ARS 1657.867463
AUD 1.772117
AWG 2.107476
AZN 1.967158
BAM 1.95687
BBD 2.357709
BDT 142.497926
BGN 1.957149
BHD 0.441394
BIF 3493.28049
BMD 1.17082
BND 1.502628
BOB 8.089286
BRL 6.360486
BSD 1.1706
BTN 103.163654
BWP 15.687311
BYN 3.962732
BYR 22948.077325
BZD 2.354367
CAD 1.622605
CDF 3361.425074
CHF 0.933688
CLF 0.028816
CLP 1130.485478
CNY 8.337996
CNH 8.336803
COP 4592.601057
CRC 590.420354
CUC 1.17082
CUP 31.026737
CVE 110.325332
CZK 24.387135
DJF 208.461328
DKK 7.465537
DOP 74.470725
DZD 152.05556
EGP 56.336238
ERN 17.562304
ETB 168.423873
FJD 2.65987
FKP 0.86523
GBP 0.865107
GEL 3.149019
GGP 0.86523
GHS 14.281566
GIP 0.86523
GMD 84.932
GNF 10150.550903
GTQ 8.972907
GYD 244.920799
HKD 9.119812
HNL 30.674775
HRK 7.537395
HTG 153.127663
HUF 393.364025
IDR 19302.260081
ILS 3.901817
IMP 0.86523
INR 103.177957
IQD 1533.638682
IRR 49262.263533
ISK 143.004509
JEP 0.86523
JMD 187.432499
JOD 0.83011
JPY 172.673157
KES 151.234785
KGS 102.388068
KHR 4691.465388
KMF 492.321805
KPW 1053.753483
KRW 1626.263512
KWD 0.357732
KYD 0.975517
KZT 630.544047
LAK 25376.576916
LBP 104831.237001
LKR 353.533332
LRD 222.417831
LSL 20.574852
LTL 3.457128
LVL 0.708217
LYD 6.329461
MAD 10.567079
MDL 19.491326
MGA 5202.578456
MKD 61.563667
MMK 2458.089099
MNT 4211.926953
MOP 9.392476
MRU 46.814601
MUR 53.269833
MVR 18.042718
MWK 2029.875378
MXN 21.810842
MYR 4.935061
MZN 74.809474
NAD 20.574852
NGN 1765.105535
NIO 43.083561
NOK 11.620403
NPR 165.064972
NZD 1.970127
OMR 0.450189
PAB 1.17058
PEN 4.088836
PGK 4.964715
PHP 66.884864
PKR 332.29922
PLN 4.265351
PYG 8385.585719
QAR 4.267934
RON 5.075156
RSD 117.151125
RUB 99.43442
RWF 1696.298657
SAR 4.392508
SBD 9.628619
SCR 17.086528
SDG 703.663433
SEK 10.948844
SGD 1.501887
SHP 0.920081
SLE 27.367888
SLL 24551.51331
SOS 669.063025
SRD 45.92952
STD 24233.615747
STN 24.512567
SVC 10.243602
SYP 15222.697152
SZL 20.554065
THB 37.185531
TJS 11.109006
TMT 4.109579
TND 3.414267
TOP 2.742178
TRY 48.337204
TTD 7.945209
TWD 35.501592
TZS 2918.265302
UAH 48.298806
UGX 4109.106711
USD 1.17082
UYU 46.755569
UZS 14463.909695
VES 181.112788
VND 30903.801071
VUV 140.202135
WST 3.179822
XAF 656.30189
XAG 0.028434
XAU 0.000321
XCD 3.1642
XCG 2.109818
XDR 0.816585
XOF 656.315911
XPF 119.331742
YER 280.528097
ZAR 20.576465
ZMK 10538.791232
ZMW 28.299993
ZWL 377.00365
  • RYCEF

    0.2200

    14.87

    +1.48%

  • RBGPF

    0.0000

    77.27

    0%

  • CMSC

    0.1300

    24.27

    +0.54%

  • NGG

    0.0200

    70.38

    +0.03%

  • CMSD

    0.0390

    24.409

    +0.16%

  • GSK

    -0.3160

    40.464

    -0.78%

  • BTI

    -0.1100

    56.15

    -0.2%

  • RIO

    0.3200

    62.19

    +0.51%

  • VOD

    -0.1450

    11.715

    -1.24%

  • RELX

    -2.0800

    45.11

    -4.61%

  • BCC

    0.1300

    85.42

    +0.15%

  • JRI

    0.1800

    13.96

    +1.29%

  • AZN

    -0.4900

    80.73

    -0.61%

  • BP

    0.5650

    34.655

    +1.63%

  • SCS

    -0.1050

    16.775

    -0.63%

  • BCE

    -0.1000

    24.1

    -0.41%

NASA's Moon mission pushed back, again
NASA's Moon mission pushed back, again / Photo: CHANDAN KHANNA - AFP/File

NASA's Moon mission pushed back, again

NASA is now targeting September 27 as the earliest possible launch date for its uncrewed Artemis 1 mission to the Moon, the agency said in a blog post Monday.

Text size:

The date would depend on engineering teams successfully carrying out a test to fuel up the Space Launch System rocket, and receive a waiver to avoid retesting batteries on an emergency flight system that is used to destroy the rocket if it strays from its designated range.

If it does not receive the waiver, the rocket will have to be wheeled back to its assembly building, pushing the timeline back several weeks.

For the September 27 date, a "70-minute launch window opens at 11:37 am EDT," while the mission would end with an ocean splashdown of the Orion capsule on November 5.

A potential next date comes on October 2.

The Artemis 1 space mission hopes to test the SLS as well as the unmanned Orion capsule that sits atop it, in preparation for future Moon-bound journeys with humans aboard.

Once launched, it will take several days for the spacecraft to reach the Moon, flying around 60 miles (100 kilometers) at its closest approach.

One of the trip's main objectives is to test the capsule's heat shield -- which at 16 feet (five meters) in diameter is the largest ever built -- when the ship re-enters the atmosphere.

The next mission, Artemis 2, will take astronauts to the Moon without landing on its surface, while the third -- set for the mid-2020s -- would see the first woman and person of color on lunar soil.

NASA wants to build a lunar space station called Gateway and keep a sustained presence on the Moon to gain insight into how to survive very long space missions, ahead of a mission to Mars in the 2030s.

I.Horak--TPP