The Prague Post - NASA's Tuesday Moon launch threatened by storm

EUR -
AED 4.305195
AFN 72.681647
ALL 95.422252
AMD 435.210269
ANG 2.098242
AOA 1076.151323
ARS 1630.008661
AUD 1.642996
AWG 2.1101
AZN 1.997526
BAM 1.955846
BBD 2.357256
BDT 143.603388
BGN 1.955479
BHD 0.44241
BIF 3481.282142
BMD 1.172278
BND 1.495035
BOB 8.087191
BRL 5.838651
BSD 1.170328
BTN 110.242601
BWP 15.852374
BYN 3.315378
BYR 22976.642144
BZD 2.353856
CAD 1.6035
CDF 2713.823208
CHF 0.92276
CLF 0.026706
CLP 1051.074801
CNY 8.014047
CNH 8.011674
COP 4166.49831
CRC 532.612567
CUC 1.172278
CUP 31.065358
CVE 110.267602
CZK 24.357004
DJF 208.414918
DKK 7.473392
DOP 69.721645
DZD 155.165661
EGP 61.583953
ERN 17.584165
ETB 180.927869
FJD 2.584462
FKP 0.866289
GBP 0.868643
GEL 3.142162
GGP 0.866289
GHS 12.993307
GIP 0.866289
GMD 86.166922
GNF 10273.242401
GTQ 8.947211
GYD 244.855777
HKD 9.185323
HNL 31.099734
HRK 7.537164
HTG 153.223615
HUF 365.188391
IDR 20224.954791
ILS 3.50048
IMP 0.866289
INR 110.48776
IQD 1533.136175
IRR 1543889.679138
ISK 143.780307
JEP 0.866289
JMD 184.694358
JOD 0.831191
JPY 186.831798
KES 151.323571
KGS 102.460824
KHR 4689.111052
KMF 492.357028
KPW 1055.049849
KRW 1731.032534
KWD 0.360781
KYD 0.975323
KZT 543.652828
LAK 25645.605119
LBP 104805.07292
LKR 373.058802
LRD 214.755067
LSL 19.461359
LTL 3.461432
LVL 0.7091
LYD 7.426175
MAD 10.828255
MDL 20.35248
MGA 4863.114747
MKD 61.641454
MMK 2462.028208
MNT 4193.389942
MOP 9.444723
MRU 46.711102
MUR 54.898206
MVR 18.112133
MWK 2029.447886
MXN 20.374308
MYR 4.648126
MZN 74.920708
NAD 19.461359
NGN 1590.781188
NIO 43.071016
NOK 10.922156
NPR 176.388162
NZD 2.000304
OMR 0.450331
PAB 1.170328
PEN 4.057796
PGK 5.08012
PHP 71.151438
PKR 326.265098
PLN 4.243587
PYG 7421.175106
QAR 4.266401
RON 5.088276
RSD 117.422771
RUB 88.242082
RWF 1710.640363
SAR 4.396537
SBD 9.431334
SCR 17.347409
SDG 703.957044
SEK 10.808811
SGD 1.495948
SHP 0.875224
SLE 28.867382
SLL 24582.071905
SOS 668.815781
SRD 43.917629
STD 24263.780751
STN 24.500578
SVC 10.240242
SYP 129.565974
SZL 19.453459
THB 37.905643
TJS 11.00136
TMT 4.108833
TND 3.417581
TOP 2.822563
TRY 52.770123
TTD 7.948188
TWD 36.907408
TZS 3045.871869
UAH 51.571617
UGX 4354.102737
USD 1.172278
UYU 46.361094
UZS 14061.331783
VES 566.403138
VND 30901.239128
VUV 137.811365
WST 3.198567
XAF 655.972478
XAG 0.015486
XAU 0.000249
XCD 3.168139
XCG 2.10925
XDR 0.815819
XOF 655.972478
XPF 119.331742
YER 279.764489
ZAR 19.382861
ZMK 10551.909878
ZMW 22.148523
ZWL 377.472928
  • RIO

    0.7600

    99.61

    +0.76%

  • CMSC

    0.0400

    22.95

    +0.17%

  • BTI

    0.8100

    58.09

    +1.39%

  • CMSD

    0.0900

    23.32

    +0.39%

  • NGG

    0.4600

    87.42

    +0.53%

  • RYCEF

    -0.1200

    15.3

    -0.78%

  • RELX

    0.4000

    36.53

    +1.09%

  • VOD

    0.0100

    15.63

    +0.06%

  • RBGPF

    64.0000

    64

    +100%

  • BP

    -0.1000

    46.25

    -0.22%

  • BCC

    0.3300

    84.15

    +0.39%

  • GSK

    -1.1900

    54.44

    -2.19%

  • BCE

    -0.2200

    23.88

    -0.92%

  • JRI

    0.0100

    12.89

    +0.08%

  • AZN

    -2.5500

    189.75

    -1.34%

NASA's Tuesday Moon launch threatened by storm
NASA's Tuesday Moon launch threatened by storm / Photo: CHANDAN KHANNA - AFP/File

NASA's Tuesday Moon launch threatened by storm

NASA's historic uncrewed mission to the Moon is facing fresh difficulties.

Text size:

After technical problems derailed two launch attempts several weeks ago, a new liftoff of the Artemis 1 mission scheduled for Tuesday is now threatened by a storm gathering in the Caribbean.

The storm, which has not yet been assigned a name, is currently located south of the Dominican Republic.

But it is expected to grow into a hurricane in the coming days and could move north to Florida, home to the Kennedy Space Center, from which the rocket is set to launch.

"Our plan A is to stay to course and to get the launch off on September 27," Mike Bolger, NASA's exploration ground systems manager, told reporters on Friday. "But we realized we also need to be really paying attention and thinking about a plan B."

That would entail wheeling the giant Space Launch System rocket back to the Vehicle Assembly Building, known as VAB.

"If we were to go down to Plan B we need a couple days to pivot from our current tanking test or launch configuration to execute rollback and get back into the protection of the VAB," Bolger said, adding that a decision should be made by early afternoon on Saturday.

On the launch pad the orange and white SLS rocket can withstand wind gusts of up to 137 kilometers per hour. But if it has to be sheltered, the current launch window, which runs until October 4, will be missed.

The next launch window will run from October 17 to 31, with one possibility of take-off per day, except from October 24-26 and 28.

A successful Artemis 1 mission will come as a huge relief to the US space agency, after years of delays and cost overruns. But another setback would be a blow to NASA, after two previous launch attempts were scrapped when the rocket experienced technical glitches including a fuel leak.

The launch dates depend on NASA receiving a special waiver to avoid having to retest batteries on an emergency flight system that is used to destroy the rocket if it strays from its designated range to a populated area.

On Tuesday the launch window will open at 11:37 local time and will last 70 minutes.

If the rocket takes off that day, the mission will last 39 days before it lands in the Pacific Ocean on November 5.

The Artemis 1 space mission hopes to test the SLS as well as the unmanned Orion capsule that sits atop, in preparation for future Moon-bound journeys with humans aboard.

Mannequins equipped with sensors are standing in for astronauts on the mission and will record acceleration, vibration and radiation levels.

The next mission, Artemis 2, will take astronauts into orbit around the Moon without landing on its surface.

The crew of Artemis 3 is to land on the Moon in 2025 at the earliest.

K.Pokorny--TPP