The Prague Post - NASA's Tuesday Moon launch threatened by storm

EUR -
AED 4.268335
AFN 73.221319
ALL 95.995822
AMD 435.377378
ANG 2.0801
AOA 1065.775351
ARS 1645.160368
AUD 1.642686
AWG 2.09494
AZN 1.975549
BAM 1.956114
BBD 2.328974
BDT 141.422701
BGN 1.914963
BHD 0.438701
BIF 3434.762603
BMD 1.162242
BND 1.480699
BOB 8.019287
BRL 6.049697
BSD 1.156391
BTN 106.669958
BWP 15.71459
BYN 3.379943
BYR 22779.934575
BZD 2.325573
CAD 1.578737
CDF 2510.44169
CHF 0.903591
CLF 0.026942
CLP 1063.823364
CNY 8.032363
CNH 8.001632
COP 4374.409916
CRC 550.490732
CUC 1.162242
CUP 30.799401
CVE 110.282702
CZK 24.359438
DJF 205.913939
DKK 7.470743
DOP 69.061383
DZD 152.855691
EGP 61.354848
ERN 17.433623
ETB 177.577468
FJD 2.562917
FKP 0.867634
GBP 0.864999
GEL 3.172683
GGP 0.867634
GHS 12.465001
GIP 0.867634
GMD 84.843804
GNF 10136.67072
GTQ 8.869576
GYD 241.918832
HKD 9.094017
HNL 30.607045
HRK 7.534234
HTG 151.49171
HUF 387.561655
IDR 19620.962015
ILS 3.590658
IMP 0.867634
INR 107.013159
IQD 1514.849677
IRR 1535204.877032
ISK 145.106082
JEP 0.867634
JMD 181.149078
JOD 0.824067
JPY 183.15532
KES 150.103752
KGS 101.638377
KHR 4640.66505
KMF 493.952675
KPW 1046.051654
KRW 1709.634418
KWD 0.357563
KYD 0.963659
KZT 575.824907
LAK 24770.976172
LBP 103549.821546
LKR 360.137808
LRD 211.040231
LSL 19.388012
LTL 3.431797
LVL 0.703028
LYD 7.385217
MAD 10.859243
MDL 20.039217
MGA 4802.791593
MKD 61.635083
MMK 2440.635948
MNT 4168.12319
MOP 9.309294
MRU 46.163609
MUR 53.405163
MVR 17.95628
MWK 2005.130484
MXN 20.519102
MYR 4.564699
MZN 74.279251
NAD 19.388012
NGN 1622.768117
NIO 42.557014
NOK 11.151545
NPR 170.67013
NZD 1.964891
OMR 0.446894
PAB 1.156386
PEN 4.025846
PGK 4.982821
PHP 68.792842
PKR 325.105184
PLN 4.252989
PYG 7441.194441
QAR 4.217149
RON 5.096895
RSD 117.439871
RUB 90.945831
RWF 1690.571366
SAR 4.363313
SBD 9.350445
SCR 16.671951
SDG 697.936729
SEK 10.628338
SGD 1.480423
SHP 0.871982
SLE 28.504002
SLL 24371.623637
SOS 659.705894
SRD 43.77813
STD 24056.053735
STN 24.504039
SVC 10.117668
SYP 128.493777
SZL 19.401198
THB 36.892447
TJS 11.083813
TMT 4.067845
TND 3.401104
TOP 2.798399
TRY 51.228511
TTD 7.846259
TWD 36.940104
TZS 3010.205727
UAH 50.818476
UGX 4353.698844
USD 1.162242
UYU 46.258818
UZS 14097.262856
VES 502.815511
VND 30497.218534
VUV 139.229241
WST 3.178155
XAF 656.062309
XAG 0.013061
XAU 0.000225
XCD 3.141016
XCG 2.084043
XDR 0.815934
XOF 656.065132
XPF 119.331742
YER 277.314768
ZAR 18.97568
ZMK 10461.571777
ZMW 22.347587
ZWL 374.241308
  • RBGPF

    0.1000

    82.5

    +0.12%

  • CMSD

    -0.0400

    23.16

    -0.17%

  • CMSC

    0.0350

    23.22

    +0.15%

  • NGG

    0.5500

    90.41

    +0.61%

  • GSK

    1.0000

    55.51

    +1.8%

  • RIO

    0.1400

    90.35

    +0.15%

  • BCE

    -0.1800

    25.88

    -0.7%

  • BTI

    0.4600

    58.33

    +0.79%

  • AZN

    0.7300

    194.95

    +0.37%

  • BP

    0.2100

    40.65

    +0.52%

  • RELX

    0.0000

    35.68

    0%

  • RYCEF

    -0.0600

    16.9

    -0.36%

  • VOD

    -0.0300

    14.48

    -0.21%

  • BCC

    -0.8600

    74.49

    -1.15%

  • JRI

    0.0100

    12.58

    +0.08%

NASA's Tuesday Moon launch threatened by storm
NASA's Tuesday Moon launch threatened by storm / Photo: CHANDAN KHANNA - AFP/File

NASA's Tuesday Moon launch threatened by storm

NASA's historic uncrewed mission to the Moon is facing fresh difficulties.

Text size:

After technical problems derailed two launch attempts several weeks ago, a new liftoff of the Artemis 1 mission scheduled for Tuesday is now threatened by a storm gathering in the Caribbean.

The storm, which has not yet been assigned a name, is currently located south of the Dominican Republic.

But it is expected to grow into a hurricane in the coming days and could move north to Florida, home to the Kennedy Space Center, from which the rocket is set to launch.

"Our plan A is to stay to course and to get the launch off on September 27," Mike Bolger, NASA's exploration ground systems manager, told reporters on Friday. "But we realized we also need to be really paying attention and thinking about a plan B."

That would entail wheeling the giant Space Launch System rocket back to the Vehicle Assembly Building, known as VAB.

"If we were to go down to Plan B we need a couple days to pivot from our current tanking test or launch configuration to execute rollback and get back into the protection of the VAB," Bolger said, adding that a decision should be made by early afternoon on Saturday.

On the launch pad the orange and white SLS rocket can withstand wind gusts of up to 137 kilometers per hour. But if it has to be sheltered, the current launch window, which runs until October 4, will be missed.

The next launch window will run from October 17 to 31, with one possibility of take-off per day, except from October 24-26 and 28.

A successful Artemis 1 mission will come as a huge relief to the US space agency, after years of delays and cost overruns. But another setback would be a blow to NASA, after two previous launch attempts were scrapped when the rocket experienced technical glitches including a fuel leak.

The launch dates depend on NASA receiving a special waiver to avoid having to retest batteries on an emergency flight system that is used to destroy the rocket if it strays from its designated range to a populated area.

On Tuesday the launch window will open at 11:37 local time and will last 70 minutes.

If the rocket takes off that day, the mission will last 39 days before it lands in the Pacific Ocean on November 5.

The Artemis 1 space mission hopes to test the SLS as well as the unmanned Orion capsule that sits atop, in preparation for future Moon-bound journeys with humans aboard.

Mannequins equipped with sensors are standing in for astronauts on the mission and will record acceleration, vibration and radiation levels.

The next mission, Artemis 2, will take astronauts into orbit around the Moon without landing on its surface.

The crew of Artemis 3 is to land on the Moon in 2025 at the earliest.

K.Pokorny--TPP